Jun
20
2009
Glossary
Posted by trompyx in Jokes, tags: Breakthrough, Design Simplicity, Different Colors, Engineering Glossary, New Software, Previous Version, Product Terminology, Second Time, Shoe String Budget, Software Engineering, Upper ManagementSoftware Engineering Glossary of Product Terminology:
NEW: Different colors from previous version.
ALL NEW: Software is not compatible with previous version.
UNMATCHED: Almost as good as the competition.
ADVANCED DESIGN: Upper management doesn’t understand it.
NO MAINTENANCE: Impossible to fix.
BREAKTHROUGH: It finally booted on the first try.
DESIGN SIMPLICITY: Developed on a shoe-string budget.
UPGRADED: Did not work the first time.
UPGRADED AND IMPROVED: Did not work the second time.
Entries (RSS)